Q: Direction : (8-11)
A, B and C can independently complete a piece of work in 20 days, 40 days and 60 days repectively. A worked alone for two days, then was joined by B. After another two days, C replaced A while B and C continued until the work was completed. After completion the contractor paid `142,80.
Find the difference (in `) between the piece of A and C in the amount paid by the contractor after the completion of the work.
A.
1,380
B.
1,428
C.
1,412
D.
1,398
Correct Answer:
Option B -
Explanations:
Download Our App
Download our app to know more Lorem ipsum dolor sit amet consectetur adipisicing elit.
Excepturi, esse.
YOU ARE NOT LOGIN
Unlocking possibilities: Login required for a world of personalized
experiences.