Correct Answer:
Option A - Working from whole to part–
• Major control points are selected and measured first with high degree of precision, minor details can be collected later on even with less degree of precision.
• The main idea of working from whole to part is to localize errors and prevent their accumulation
• Less number of instruments are required for surveying.
A. Working from whole to part–
• Major control points are selected and measured first with high degree of precision, minor details can be collected later on even with less degree of precision.
• The main idea of working from whole to part is to localize errors and prevent their accumulation
• Less number of instruments are required for surveying.